Assessing support alternatives for longwall gateroads subject to changing stress
Esterhuizen GS , Tulu IB , Gearhart DF , Dougherty H , van Dyke M . Int J Min Sci Technol 2020 31 (1) 103-110 Longwall gateroad entries are subject to changing horizontal and vertical stress induced by redistribution of loads around the extracted panel. The stress changes can result in significant deformation of the entries that may include roof sag, rib dilation, and floor heave. Mine operators install different types of supports to control the ground response and maintain safe access and ventilation of the longwall face. This paper describes recent research aimed at quantifying the effect of longwall-induced stress changes on ground stability and using the information to assess support alternatives. The research included monitoring of ground and support interaction at several operating longwall mines in the U.S., analysis and calibration of numerical models that adequately represent the bedded rock mass, and observation of the support systems and their response to changes in stress. The models were then used to investigate the impact of geology and stress conditions on ground deformation and support response for various depths of cover and geologic scenarios. The research results were summarized in two regression equations that can be used to estimate the likely roof deformation and height of roof yield due to longwall-induced stress changes. This information is then used to assess the ability of support systems to maintain the stability of the roof. The application of the method is demonstrated with a retrospective analysis of the support performance at an operating longwall mine that experienced a headgate roof fall. The method is shown to produce realistic estimates of gateroad entry stability and support performance, allowing alternative support systems to be assessed during the design and planning stage of longwall operations. |
Analysis of gateroad stability at two longwall mines based on field monitoring results and numerical model analysis
Esterhuizen GS , Gearhart DF , Klemetti T , Dougherty H , van Dyke M . Int J Min Sci Technol 2018 29 (1) 35-43 Coal mine longwall gateroads are subject to changing loading conditions induced by the advancing longwall face. The ground response and support requirements are closely related to the magnitude and orientation of the stress changes, as well as the local geology. This paper presents the monitoring results of gateroad response and support performance at two longwall mines at a 180-m and 600-m depth of cover. At the first mine, a three-entry gateroad layout was used. The second mine used a four-entry, yield-abutment-yield gateroad pillar system. Local ground deformation and support response were monitored at both sites. The monitoring period started during the development stage and continued during first panel retreat and up to second panel retreat. The two data sets were used to compare the response of the entries in two very different geotechnical settings and different gateroad layouts. The monitoring results were used to validate numerical models that simulate the loading conditions and entry response for these widely differing conditions. The validated models were used to compare the load path and ground response at the two mines. This paper demonstrates the potential for numerical models to assist mine engineers in optimizing longwall layouts and gateroad support systems. |
Analysis of monitored ground support and rock mass response in a longwall tailgate entry
Esterhuizen GS , Gearhart DF , Tulu IB . Int J Min Sci Technol 2017 28 (1) 43-51 A comprehensive monitoring program was conducted to measure the rock mass displacements, support response, and stress changes at a longwall tailgate entry in West Virginia. Monitoring was initiated a few days after development of the gateroad entries and continued during passage of the longwall panels on both sides of the entry. Monitoring included overcore stress measurements of the initial stress within the rock mass, changes in cable bolt loading, standing support pressure, roof deformation, rib deformation, stress changes in the coal pillar, and changes in the full three-dimensional stress tensor within the rock mass at six locations around the monitoring site. During the passage of the first longwall, stress measurements in the rock and coal detected minor changes in loading while minor changes were detected in roof deformation. As a result of the relatively favorable stress and geological conditions, the support systems did not experience severe loading or rock deformation until the second panel approached within 10-15 m of the instrumented locations. After reaching the peak loading at about 50-75 mm of roof sag, the cable bolts started to unload, and load was transferred to the standing supports. The standing support system was able to maintain an adequate opening inby the shields to provide ventilation to the first crosscut inby the face, as designed. The results were used to calibrate modeled cable bolt response to field data, and to validate numerical modeling procedures that have been developed to evaluate entry support systems. It is concluded that the support system was more than adequate to control the roof of the tailgate up to the longwall face location. The monitoring results have provided valuable data for the development and validation of support design strategies for longwall tailgate entries. |
Vertical load capacities of roof truss cross members
Gearhart DF , Morsy MK . Int J Min Sci Technol 2016 26 (3) 517-520 Trusses used for roof support in coal mines are constructed of two grouted bolts installed at opposing forty-five degree angles into the roof and a cross member that ties the angled bolts together. The load on the cross member is vertical, which is transverse to the longitudinal axis, and therefore the cross member is loaded in the weakest direction. Laboratory tests were conducted to determine the vertical load capacity and deflection of three different types of cross members. Single-point load tests, with the load applied in the center of the specimen and double-point load tests, with a span of 2.4 m, were conducted. For the single-point load configuration, the yield of the 25 mm solid bar cross member was nominally 98 kN of vertical load, achieved at 42 cm of deflection. For cable cross members, yield was not achieved even after 45 cm of deflection. Peak vertical loads were about 89 kN for 17 mm cables and 67 kN for the 15 mm cables. For the double-point load configurations, the 25 mm solid bar cross members yielded at 150 kN of vertical load and 25 cm of deflection. At 25 cm of deflection individual cable strands started breaking at 133 and 111 kN of vertical load for the 17 and 15 mm cable cross members respectively. |